1- FACILITY DESIGN:
1.1. Demand capacity: Guest service
✔ Number of guests per service
✔VIP service area.
1.2. Ground status:
✔Total planning area for mud bathing areas.
✔Current status of available construction in mud bathing areas: swimming pool, waterfall, cistern, etc…
✔Quantity, types of soaking tubs (bathtubs 1-2 / 3-5 / 8-10 people).
✔Total of clean water sources present in mud bathing areas.
1.3. Technology options.
1.3.1. The slurry must be heated to 100 degrees C to sterilize, so a heating system is needed. Block of mud, after heating to 100 degrees C, will need a cold water source to cool down and bring to the appropriate temperature for bathing 36-38 degrees C. There are 2 heating technology options:
✔Direct heating
✔Indirect heating
1.3.2. Choose an option to use heat efficiently from a cooling water source.
2- DESIGN:
2.1. Design of sludge heat treatment system.
2.2. Design of operating system: Technology tank, sludge, mud pipeline system – mineral water, electric control mud – mineral water, mixing/annealing mud, sludge supply – recovery system.
2.3. Design of auxiliary items: swimming pool, Jacuzzi, hot and cold Olsen pool, floor water spray, aquatic materials, water swing, waste water treatment system.
3- CONSTRUCTION:
3.1. Construction of mud heating system – mineral water.
3.2. Construction of operating system for sludge supply/ collecting mud – mineral water.
3.3. Construction of mud bath infrastructure: bathtub, technology pipe.
3.4. Construction of auxiliary items.
Tran-Dong A Environmental Technology Co. Ltd (TDA)
🏚 Add: 156 Le Dinh Ly st., Vinh Trung ward, Thanh Khe dist., Da Nang, Viet Nam
✔ Website: www.dongagreen.com.vn / www.thietketambun.com
📝 Email : info@dongagreen.com.vn (Mr. Hiep)/ tran-donga@dongagreen.com.vn (Ms. Thao)
📞 Hotline : 0932 655 622 / (0236) 3 655 622